KURDISTAN, IRAQ WATER TANK INSTALLATION

ABOUT THEIR PROJECT


DATE

26/05/2017

COMPANY

Government Project – Kurdistan Iraq

REQUIREMENTS

Manufacture, deliver and supervise installation of the water storage tank in Kurdistan.

PRODUCT SUPPLIED

GRP Hot press insulated sectional tank with externally flanged sides & base 9x9x4m high.

TANK DIMENSIONS & CAPACITY

9 x 9 x 4-meter-high sectional water tank to hold a nominal capacity of 324,000 litres.

Iraqi Kurdistan officially called the Kurdistan Region by the Iraqi constitution, is located in the north of Iraq and constitutes the country’s only autonomous region. Kurdistan region has a population of an estimated 3 million people. Many works are ongoing in this area, large-scale regeneration projects were completed in late 2016 and further projects ongoing are scheduled for completion in 2017, all leading to aiding in the recovery of the area, improving economic stability by boosting employment and improving the area’s infrastructure & development.

This project involved the assessment, manufacture, export of the tank, shipping documentation & installation supervision by a senior engineer at Dewey Waters.

Our experienced logistics personnel organised the pre-shipment inspections and prepared export and import documentation on behalf of our clients ensuring a complete and hassle-free service.

Our client required a water storage tank to hold a total capacity of 324,000 litres, the contract required installation at the top of a steel tower. The water tower at this location consisted of an elevated structure built to support a water storage tank, it was constructed at a height sufficient enough to pressurise a water supply system for the distribution of potable water.
Water tanks constructed on top of an elevated height are the ideal solution to ensure constant water is available. This water tower supplies water even during power outages because it relies on hydrostatic pressure produced by the elevation of water (due to gravity) to push the water into domestic and industrial water distribution systems;
The Tank panels & connections were dispatched on the 21st of November, once the tank was delivered in Kurdistan our client requested a change in connections sizes, this was processed efficiently and professionally by our sales & logistics team. Additional connections were manufactured and sent express via air freight.

As standard, err on the side of caution our dispatch team send a spares tank kit with all export tanks to ensure each project runs as smoothly as possible in a timely manner.

Part of the import/export package our logistics personnel supplied a European Certificate of Origin, a packing list and a material statement to satisfy custom and government officials in Iraq, our experienced logistics team have an understanding of custom requirements for shipping worldwide ensuring a speedy delivery.

The client specification insisted that the product supplied was a hot press moulded tank which needed to conform to both British and Singapore water storage standards.

A prerequisite required the tank to be tested up to six times the working pressure to satisfy the local councils. Once all documentation and certifications of testing were approved the construction took place in early January 2017.

Our senior installation engineer travelled to Kurdistan to supervise the tank assembly. The objective, to oversee the operation, including delivery, construction, testing, this ensured our client the construction and quality of the tank were approved to British standards guaranteeing its longevity.

Due to the tank construction taking place at a height of 20 meters, the base panels were craned to the top of the tower, once the base was completed the remaining panels and parts were craned up and placed in the middle of the tank, this meant that the crane could leave the site.

Machinery time on site was kept to a minimum, providing our client with the most cost-effective solution.
Some of the difficulties our engineer and partners experienced while assembling the tank included heavy snow storms and high winds which halted the tank construction efforts for a time. Due to the height requirements of the build, the health and safety of the crew were at the forefront of the decision process and building was stopped for a total of two days. Once the weather settled and it was deemed safe to continue the assembly crews which included six from the construction team, their supervisor, and finally, Dewey Waters Senior Engineer who supervised the overall operation commenced construction. Despite these conditions and setbacks, the construction of the tank was finished on time with a total build time of twenty days from start to finish, our site engineer was on site for the first and last week of the build.

At Dewey Waters, we offer a deep understanding of the demands presented by international markets and conditions, our technical expertise, innovative manufacturing methods, extensive product range and a wealth of knowledge spanning 60 years, put us at the forefront of international water tank exports. By taking care of all documentation the process is as smooth and hassle-free as possible.

We have an established reputation of which we are very proud of being one of the foremost international exporters of water tanks, housing/kiosks, and other GRP products.

Our services include:

• Export & Import documentation provided
• Experience in pre-shipment inspections
• Manufacturing
• Water tanks factory tested & certified
• Transportation
• Shipping
• Installation supervision
• Installation training
• Spares Kit

Previous export projects 
Nigeria, Croatia, Iraq, Luxemburg, Ascension Islands, Italy, Ghana, Egypt, Saudi Arabia, Barbados, Gibraltar, Azerbaijan.

If you have a site that requires more specialist project management or a complex design please contact our technical sales team who will be able to confirm how Dewey Waters can assist you.

Sectional Tank installed at Kurdistan in Iraq
Water Tank Installation at Kurdistan in Iraq

DEWEY WATERS FEATURES

Specialising in the manufacture of both one piece and sectional cold water storage tanks, our experience ensures that we are able to accommodate virtually all client requirements.

on time delivery van icon

On time Delivery

Placing and receiving your order is a straightforward, hassle-free process.

technical advice icon

Technical Advice

We provide high levels of technical knowledge, product choice and customer service.

Fully certified icon

Fully Certified

Dewey Waters is an accredited & certified GRP water tank manufacturer.

Experts Installations icon

Experts Installation

60 years’ industry experience in both Water Storage and GRP industries.

on time delivery van icon

On Time Delivery

Placing and receiving your order is a straightforward, hassle-free process.

technical advice icon

Technical Advice

We provide high levels of technical knowledge, product choice and customer service.

Fully certified icon

Fully Certified

Dewey Waters is an accredited & certified GRP water tank manufacturer.

Experts Installations icon

Experts Installation

60 years’ industry experience in both Water Storage and GRP industries.

WORK WITH US ON YOUR NEXT PROJECTS

60 years’ industry experience, trusted & reputable supplier

View our testimonials

Contact our experts